Project

Battery Electric Underground Roof Bolter

Customer:   MacLean Engineering

Share This

About The Project

GOLDCORP has stated that their Borden Lake mine will be the first all Electric mine in Canada. Taking on this challenge meant acquiring many different pieces of machinery. Since Battery Electric equipment is still relatively new technology for the underground mining industry there are still several pieces of equipment that don’t have electric equivalents. Happy with the technology MEDATECH provided in the MacLean EV equipment, GOLDCORP and MacLean Engineering reached out to MEDATECH to see if we could do the dirty work of converting some of the more difficult and peculiar machines. Since the powertrain of the MacLean 977 had similar performance characteristics to a Motor Grader we accepted the challenge to convert and reman a used CAT 12M3 machine for the Borden Lake Project.

Why Electric

Battery Electric Equipment allows a mine to unlock a trifecta of benefits: improved health and safety, reduced greenhouse gas emissions, and decreased operating costs. Removing emissions from even a few meters, never mind kilometers, below the ground requires massive ventilation infrastructure—shafts, equipment, and enormous amounts of electricity to run the machinery.

“Moving away from diesel and by achieving other reductions associated with the use of clean technologies, (a typical mine) can avoid more than 7,500 tons of CO2 and eliminate 3 million liters of diesel fuel, 1 million liters of propane and 35,000 megawatt hours of electricity every year.”

Challenges

  • Maclean Engineering tasked MEDATECH with the challenge of delivering a working Battery electric powertrain in an extreamly short timeline.
  • Although these machines have the advantage of being plugged-in when they are drilling our design allowed the machines to drill from battery which is also a first in industry.
  • The success of this machine weighed heavily on the performance and safety of the batteries. MEDATECH formed a partnership with the leading Lithium Ion battery producer in the world that has both the best energy density and charging performace.
  • The machine are implemented in underground mining where charging infrastructure is difficult to manage

Solutions

  • Using a design preparred for Ontario Power Generation MEDATECH was able to implement the battery technology extreamly fast for the MacLean machine
  • Instead of offering multiple charging station MEDATECH devised a plan of mobile on-board charging that travels with the machine. This gave the units ultimate flexibility.
  • Project Team was highly integrated with the MacLean engineering organization, aligned to objectives and committed to delivery.
  • Amid the downturn in Mining this development allowed Maclean Engineering to gain market share in a new sector

Highlights

  • Drill from Battery is the first in industry
  • Advanced battery technology is both the safest and most energy dense.
  • Fast charging and ultimate flexibility with on-board charger.
  • MacLean Engineering landed a large order for the conversions to the GOLDCORP borden project. The units provided are the only truly battery electric utility machines being delivered to this site.

Facilities Expansion Underway

The building is well underway!  We’re adding 5,000 sq-ft of new shop space and a 10-ton crane to better serve MEDATech’s clients around the globe, and we’re excited about it! {post_name} {team_member} {customer}

MEDATECH to supply innovative drilling system for rehabilitation of aging dam infrastructure

January 14th, 2019: MEDATECH is excited to announce that they have agreed to terms for the supply of an innovative drilling system. The system will be used for rehabilitation of aging dam infrastructure in the southern United States. The customer has been conducting extensive on-site assessment of their existing drilling systems for dam rehabilitation. With recent … Read more

Nouveau Monde Graphite completes feasibility showing an “all-electric open-pit mine can be built that delivers ample shareholder returns”

Oct. 25, 2018  Nouveau Monde Graphite announced the results of their “all-electric open-pit” feasibility study. The results are favorable for the all electric solution and will have a significant impact on the future of mining. “The mine will be using an all-electric, zero-emission mine fleet, consisting of electric battery-driven 36.3-t mining trucks, battery-driven front-end loaders, cable … Read more

MEDATECH invests in Expansion to Office and Shop, including 4,000 sq-ft “electronics lab”

After several successful years and significant growth in our engineering and fabrication services, MEDATECH is re-investing in their facilities at the Collingwood location. “The expansion will increase our technical capabilities and give us more room to take on larger and more challenging projects” Says Robert Rennie, President of MEDATECH Engineering. The expansion includes over 5,000 … Read more

First Ever All-Electric Open-Pit Mine: The Feasibility Study Will Be Completed By 2018

June 12, 2018 Most of us relate electrification to underground mining for many obvious reasons, lower ventilation requirement and cost optimization being the two primary ones. The question is ‘Does electrification hold equally good with respect to open-pit mining?’. With a belief that electrification makes sense irrespective of the nature of mining, NMG CEO Éric … Read more

MEDATECH completes 100% battery electric retrofit of diesel grader for GOLDCORP Borden Lake

April 29. 2018 Chapleau Ont., MEDATECH and its partners are proud to announce the delivery of the first ever 100% battery electric retrofit motor grader to the Goldcorp Borden Lake Mine. The project was a joint effort with MacLean Engineering who will be commissioning the system this week underground at the Chapleau mine. See our project … Read more

NMG poised to have the first ever electric open-pit mine

April 10. 2018 Montreal, Quebec — Nouveau Monde Graphite (NMG) intends on completing by the end of 2018 its feasibility study leading to the implantation of the first ever electric open-pit mine. The results of this study will serve to confirm the project’s economic viability and to determine how best to exploit the graphite deposit of … Read more

Why the mines of the future will be diesel free

Why the mines of the future will be diesel free Goldcorp Inc., a gold producer based in Vancouver, BC, recently announced plans to build the world’s first diesel-free hard rock mine near Chapleau, Ontario. Going diesel-free is an ambitious goal. A typical mine can have dozens of diesel engines across its heavy equipment fleet. Going … Read more

How to choose the best industrial lithium battery

How to choose the best industrial lithium battery By: David Francis Lyon, Business Development Manager I recently returned from a large equipment Expo. My goal there was to understand the state of the heavy equipment industry with respect to adapting EV (electric vehicle) technology. There were several machines on display billed as either “Hybrid” or “Electric” … Read more

Hours: Mon - Fri: 9 Am - 5 PM

Saturday and Sunday - CLOSED

Phone: +1 (705) 443-8440

info@altdrivesystems.com

Collingwood ON., Canada

Ocala FL., USA