About The Project

The “Muckahi” process, conceptualized and patented by Fred Stanford, President & CEO of Torex theoretically revolutionizes steep incline methods of mineral extractions. After stumbling with some other more industrial focused engineering firms Mr. Stanford approached MEDATECH to take his “Muckahi” methods and develop the necessary equipment to make his process work.

“The concept for recovery of the Media Luna resource is through underground mining methods at 7,000 t/d with the mineralized material being transported via a hybrid underground / aerial / underground rope conveyor to the ELG processing plant. Processing to produce both a Copper/Gold/Silver concentrate as well as dore bars would be completed using the existing plant and through a circuit to be added for flotation and concentrate handling. Tailings required for paste backfill would be transported back to the underground mine utilizing the same rope conveyor that transported the mineralized material to the processing facility.”

More about Torex Gold here

Highlights

  • Overhead rails provide an efficient and cost effective means of moving people, mining devices, and ore out of a steep underground mine.
  • Modified machinery allows for increased production rates and less handling (moving towards continuous production methods).
  • Torex finding big wins in NPV and IRR with the newly developed “Muckahi” process.

Testimonial

Robert Rennie and his teams years of experience in equipment design enabled us to truly seek out and eliminate the bottlenecks in the Muckahi process. They built on existing technologies and focused their energy on the improvements that really built value for the Media Luna Project.

Fred Stanford, President & CEO Torex Gold 

Facilities Expansion Underway

The building is well underway!  We’re adding 5,000 sq-ft of new shop space and a 10-ton crane to better serve MEDATech’s clients around the globe, and we’re excited about it! {post_name} {team_member} {customer}

MEDATECH to supply innovative drilling system for rehabilitation of aging dam infrastructure

January 14th, 2019: MEDATECH is excited to announce that they have agreed to terms for the supply of an innovative drilling system. The system will be used for rehabilitation of aging dam infrastructure in the southern United States. The customer has been conducting extensive on-site assessment of their existing drilling systems for dam rehabilitation. With recent … Read more

Nouveau Monde Graphite completes feasibility showing an “all-electric open-pit mine can be built that delivers ample shareholder returns”

Oct. 25, 2018  Nouveau Monde Graphite announced the results of their “all-electric open-pit” feasibility study. The results are favorable for the all electric solution and will have a significant impact on the future of mining. “The mine will be using an all-electric, zero-emission mine fleet, consisting of electric battery-driven 36.3-t mining trucks, battery-driven front-end loaders, cable … Read more

MEDATECH invests in Expansion to Office and Shop, including 4,000 sq-ft “electronics lab”

After several successful years and significant growth in our engineering and fabrication services, MEDATECH is re-investing in their facilities at the Collingwood location. “The expansion will increase our technical capabilities and give us more room to take on larger and more challenging projects” Says Robert Rennie, President of MEDATECH Engineering. The expansion includes over 5,000 … Read more

First Ever All-Electric Open-Pit Mine: The Feasibility Study Will Be Completed By 2018

June 12, 2018 Most of us relate electrification to underground mining for many obvious reasons, lower ventilation requirement and cost optimization being the two primary ones. The question is ‘Does electrification hold equally good with respect to open-pit mining?’. With a belief that electrification makes sense irrespective of the nature of mining, NMG CEO Éric … Read more

MEDATECH completes 100% battery electric retrofit of diesel grader for GOLDCORP Borden Lake

April 29. 2018 Chapleau Ont., MEDATECH and its partners are proud to announce the delivery of the first ever 100% battery electric retrofit motor grader to the Goldcorp Borden Lake Mine. The project was a joint effort with MacLean Engineering who will be commissioning the system this week underground at the Chapleau mine. See our project … Read more

NMG poised to have the first ever electric open-pit mine

April 10. 2018 Montreal, Quebec — Nouveau Monde Graphite (NMG) intends on completing by the end of 2018 its feasibility study leading to the implantation of the first ever electric open-pit mine. The results of this study will serve to confirm the project’s economic viability and to determine how best to exploit the graphite deposit of … Read more

Why the mines of the future will be diesel free

Why the mines of the future will be diesel free Goldcorp Inc., a gold producer based in Vancouver, BC, recently announced plans to build the world’s first diesel-free hard rock mine near Chapleau, Ontario. Going diesel-free is an ambitious goal. A typical mine can have dozens of diesel engines across its heavy equipment fleet. Going … Read more

How to choose the best industrial lithium battery

How to choose the best industrial lithium battery By: David Francis Lyon, Business Development Manager I recently returned from a large equipment Expo. My goal there was to understand the state of the heavy equipment industry with respect to adapting EV (electric vehicle) technology. There were several machines on display billed as either “Hybrid” or “Electric” … Read more

Hours: Mon - Fri: 9 Am - 5 PM

Saturday and Sunday - CLOSED

Phone: +1 (705) 443-8440

info@altdrivesystems.com

Collingwood ON., Canada

Ocala FL., USA