OEM Integrations

Featured Projects

OEM Integrations

Battery Electric Underground Mining

Battery Electric Underground Mining Truck

GOLDCORP has stated that their Borden Lake mine will be the first all Electric mine in Canada. Taking on this challenge meant acquiring many different pieces of machinery.

Torex Gold

Media Luna “Muckahi” Feasibility

The “Muckahi” process, conceptualized and patented by Fred Stanford, President & CEO of Torex theoretically revolutionizes steep incline methods of mineral extractions….

Battery Electric Underground Mining

Battery Electric Underground Roof Bolter

GOLDCORP has stated that their Borden Lake mine will be the first all Electric mine in Canada. Taking on this challenge meant acquiring many different pieces of machinery.

Prefeasibility – All Electric Open-Pit Mine

Nouveau Monde Graphite Inc. (“NMG”) is developing a world-class all electric open-pit operation located in the vicinity of Saint-Michel-des-Saints in the region of Lanaudière, Québec….

Battery Electric Motor Grader

Battery Electric Motor Grader Retrofit

GOLDCORP has stated that their Borden Lake mine will be the first all Electric mine in Canada. Taking on this challenge meant acquiring many different pieces of machinery.

Boom Truck Quad Charger Integration (100kW Fast Charger)

MEDATECH proposed an optional retrofit to their Mine-Mate Series BT2 & BT3-Boom Trucks to increase the charging capacity of these vehicles using MEDATECH’s proprietary 25kW on-board charging solution.

Hybrid Drive Feasibility Study, GEN 4 Transporter

Driven by the desire to embrace the latest in Electric Propulsion technology, OPG wanted to assess the feasibility of Hybrid Drive’s integration into its operation….

Hours: Mon - Fri: 9 Am - 5 PM

Saturday and Sunday - CLOSED

Phone: +1 (705) 443-8440

info@altdrivesystems.com

Collingwood ON., Canada

Ocala FL., USA