ALL PROJECTS
Battery Electric Underground Mining Truck
GOLDCORP has stated that their Borden Lake mine will be the first all Electric mine in Canada. Taking on this challenge meant acquiring many different pieces of machinery.
Read MoreWS6000 Drill Rig
Hybrid Wassara water hammer and Sonic drill rig with RodBot pipe handler.
Read MoreBattery Electric Motor Grader Retrofit
GOLDCORP has stated that their Borden Lake mine will be the first all Electric mine in Canada. Taking on this challenge meant acquiring many different pieces of machinery.
Read MoreMedia Luna “Muckahi” Feasibility
The “Muckahi” process, conceptualized and patented by Fred Stanford, President & CEO of Torex theoretically revolutionizes steep incline methods of mineral extractions….
Read MoreOil & Gas Slant Drill #1
Working with Blue Rock Energy & Cubex Limited we designed and built the first drilling rig for angled holes in oil and gas
Read MoreMobile Rockbreaker Development
MacLean Engineering, a leader and global supplier of underground mining equipment, engaged MEDATech Engineering to design a fit for purpose breaker boom and operators cab for their new line of mobile breakers.
Read MoreCAT 777F Trailer Brakes and Cooling
MEDATECH Engineering was commissioned to assist in design of the braking and brake cooling system on a trailer being attached to a CAT 777F haul truck and supplied to TransAlta coal through Finning.
Read MoreHydro Dam – Stator Jacking Towers
Andritz Hydro was commissioned by Ontario Power Generation to provide several new hydro turbines for the Lower Matagami and Lower Notch powerstation projects.
Read MoreBoom Truck Quad Charger Integration (100kW Fast Charger)
MEDATECH proposed an optional retrofit to their Mine-Mate Series BT2 & BT3-Boom Trucks to increase the charging capacity of these vehicles using MEDATECH’s proprietary 25kW on-board charging solution.
Read MoreHybrid Drive Feasibility Study, GEN 4 Transporter
Driven by the desire to embrace the latest in Electric Propulsion technology, OPG wanted to assess the feasibility of Hybrid Drive’s integration into its operation….
Read MoreBattery Electric Underground Roof Bolter
GOLDCORP has stated that their Borden Lake mine will be the first all Electric mine in Canada. Taking on this challenge meant acquiring many different pieces of machinery.
Read MorePrefeasibility – All Electric Open-Pit Mine
Nouveau Monde Graphite Inc. (“NMG”) is developing a world-class all electric open-pit operation located in the vicinity of Saint-Michel-des-Saints in the region of Lanaudière, Québec….
Read MoreCustom Foundation Drill
In 2010 MEDATECH responded to a request from HYDRO ONE to supply a Truck mounted 12′ Diameter Auger drill …
Read MoreCamiro Micro Bolter
The mining industry has an enviable record of overcoming engineering challenges, but one challenge that has baffled equipment designers and engineers until now…
Read MoreOPG Waste Haulage Fleet Management
Ontario Power Generation contracted MEDATECH to make major repairs to a recently commissioned nuclear waste transporter….
Read More