Project

Oil & Gas Slant Drill #1

Customer:   Bluerock Energy / Cubex Ltd.

About The Project

Working with Blue Rock Energy & Cubex Limited we designed and built the first drilling rig for angled holes in oil and gas applications using a Schramm TXD 130. This involved the design of the sub, drilling floor, mast supporting system and pipe handling systems. We supplied the engineering expertise to Cubex as they worked closely with the Oil & Gas application expertise in Cubex Ltd and the Contractor Blue Rock Energy.

Media Luna “Muckahi” Feasibility

The “Muckahi” process, conceptualized and patented by Fred Stanford, President & CEO of Torex theoretically revolutionizes steep incline methods of mineral extractions….

Read More

Prefeasibility – All Electric Open-Pit Mine

Nouveau Monde Graphite Inc. (“NMG”) is developing a world-class all electric open-pit operation located in the vicinity of Saint-Michel-des-Saints in the region of Lanaudière, Québec….

Read More

Battery Electric Motor Grader Retrofit

GOLDCORP has stated that their Borden Lake mine will be the first all Electric mine in Canada. Taking on this challenge meant acquiring many different pieces of machinery.

Read More

OPG Waste Haulage Fleet Management

Ontario Power Generation contracted MEDATECH to make major repairs to a recently commissioned nuclear waste transporter….

Read More

Hours: Mon - Fri: 9 Am - 5 PM

Saturday and Sunday - CLOSED

Phone: +1 (705) 443-8440

info@altdrivesystems.com

Collingwood ON., Canada

Ocala FL., USA